PROJECT OVERVIEW

We are currently working on an offshore wind farm located approximately 34km from Zeebrugge in the Belgium section of the North Sea. The offshore wind farm will have an installed capacity of 309MW, and is to be installed in Q3 2017.

Swan Hunter were contracted to provide specialist engineering and installation analysis services to NKT for offshore cable installation operations planned for summer 2017 using the newly commissioned NKT Victoria cable laying vessel.

Scope of work involved

Vessel Operability Analysis

Developing Installation Vessel assistance solutions; including tug assistance, 6-Point Anchor Mooring, or mid-line support barge options

Mooring and Beaching Analysis for Lay and Beach Pull-in operations